Monday, October 22, 2007



This is the main drum of the new roller furling system I'm installing. I've never seen a roller furling drum this big. We're hoping to take Epilogue north to Everett in a couple of weeks to have the mast stepped and rigged and return to Ballard for the winter. This will be a huge event. She'll look like a real sailboat and have a mast that is 73' off the deck.


This is the new mast collar and cut-out where the mast will enter into the boat. Have to get some work done before the mast makes it impossible get back in there.

No comments: